Inspecting stone sample panels
Selecting the correct stone is arguably the most important part of a project and presents the best opportunity for avoiding potential problems in the future. This article considers the specific but important issue of what to look for in a stone sample panel. While this may seem like a very niche topic, it affects much of the selection process and so deserves more in depth discussion.
The mine or quarry that stone is sourced from should have range/control panels showing the geological characteristics typically found in the various beds available (shown below). This provides the customer with the truest indication of the variation they can expect to find in stone from the bed they are using. This is vital to the effective management of customer expectations as stone is a natural material and not every piece will look the same. If this is understood then the unique aesthetic that natural stone provides can be celebrated and built into the design rather than cause tensions between the quarry and the customer.
Ultimately it is the quarry or mine’s responsibility to select a suitable number of samples from the chosen bed to show the typical range of geological variations that are present, but if the production company has already been and selected the stones and the blocks are all in stock and available for a pre-purchase, then this can be completed at their works instead.
Inspection should take place at the extraction site, but if this is not possible, then confirmation that the quarry has been closely consulted in the sample selection must be sought.
The range/control panels from the different quarries and beds should be carefully inspected and then the final selection made and high resolution photographs taken for future reference.
The rejection of geological characteristics naturally found in the stone will typically result in increased costs and prolonged procurement through abortive cutting and will increase wastage and carbon footprint and so the overall sustainability of the supply.
Any comparison between the range/control samples and the actual production should be carried out in normal daylight for external stone work or perhaps similar light conditions to the project for internal works. Wherever possible, samples should be viewed from a distance of 2m as stated in all the relevant British Standards and in the orientation in which the stone will be used.
--Stone Federation Great Britain
[edit] Related articles on Designing Buildings Wiki
- 2016 Natural Stone Awards.
- Choosing stone.
- Defects in stonework.
- Kentish ragstone.
- Limestone for building.
- Natural stone.
- Natural stone cladding.
- Natural Stone for Interiors.
- Natural stone tiles.
- Portland Stone.
- Surface Design Show 2017.
- Sustainable stone.
- Types of stone.
[edit] External references
- Stone Federation, Selecting the Correct Stone.
Featured articles and news
International Electrician Day, 10 June 2025
Celebrating the role of electrical engineers from André-Marie Amperè, today and for the future.
New guide for clients launched at Houses of Parliament
'There has never been a more important time for clients to step up and ...ask the right questions'
The impact of recycled slate tiles
Innovation across the decades.
EPC changes for existing buildings
Changes and their context as the new RdSAP methodology comes into use from 15 June.
Skills England publishes Sector skills needs assessments
Priority areas relating to the built environment highlighted and described in brief.
BSRIA HVAC Market Watch - May 2025 Edition
Heat Pump Market Outlook: Policy, Performance & Refrigerant Trends for 2025–2028.
Committing to EDI in construction with CIOB
Built Environment professional bodies deepen commitment to EDI with two new signatories: CIAT and CICES.
Government Grenfell progress report at a glance
Line by line recomendation overview, with links to more details.
An engaging and lively review of his professional life.
Sustainable heating for listed buildings
A problem that needs to be approached intelligently.
50th Golden anniversary ECA Edmundson apprentice award
Deadline for entries has been extended to Friday 27 June, so don't miss out!
CIAT at the London Festival of Architecture
Designing for Everyone: Breaking Barriers in Inclusive Architecture.
Mixed reactions to apprenticeship and skills reform 2025
A 'welcome shift' for some and a 'backwards step' for others.
Licensing construction in the UK
As the latest report and proposal to licence builders reaches Parliament.
Building Safety Alliance golden thread guidance
Extensive excel checklist of information with guidance document freely accessible.
Fair Payment Code and other payment initiatives
For fair and late payments, need to work together to add value.
Pre-planning delivery programmes and delay penalties
Proposed for housebuilders in government reform: Speeding Up Build Out.
High street health: converting a building for healthcare uses
The benefits of health centres acting as new anchor sites in the high street.